Quality over quantity is our company policy, we do not venture in many projects, however we try to focus in what we can excel at, if we feel at any point that we cannot sustain a quality work we do not proceed.

SWRO Plant – DEWA (Acciona – Besix JV)

dewa 1.jpg

Dubai Electricity and Water Authority (DEWA) has completed 92.4% of the Seawater Reverse Osmosis (SWRO) desalination plant at Jebel Ali Power Plant and Desalination Complex. The Complex is the main supplier of Dubai’s electricity and water services with a high level of reliability, efficiency, and quality

dewa 2.jpg

DEWA had awarded the implementation of the AED 871 million plant, with a production capacity of 40 Million Imperial Gallons of Water per Day (MIGD) of desalinated water, to a consortium led by Spain’s Acciona Agua and Belhasa Six Construct (BeSIX).

POTAIN

MC235erected on static

chassis at 57m HUH

Millenium, Binghatti Residence Project, Business Bay, Dubai

The 22-storey tower embraces the latest design technology to provide a truly state of the art home for its residents in one of the most up and coming areas of Dubai. The contemporary studio, one, and two- bedroom apartments that comprise Millennium Bing Hatti Residences are designed to maximize spatial use and functionality without compromising comfort and elegance.

 

We managed the project with a Potain MR225 at 120m HUH until it was fully completed.

BINGHATTI RESIDENCE.png
bb1.jpg

Al Wasl Tower, Saleh Construction

AL WASL 1.jpg
AL WASL TOWER_edited.jpg

The Wasl Tower is a benchmark 302 meter super-high-rise structure in a pivotal Dubai location. The Wasl Tower will have one of the world’s tallest ceramic facades and will be a regional touchstone for adaptability and sustainability.

Its capacity to acclimatize to local temperatures through shading and cooling techniques sets this building apart within the hot desert climate. Its design aesthetic

and 'contrapposto' structure revolves around ‘Figures in Motion’ and references the interconnectivity of Dubai’s complex and thorough infrastructure.

 

It is very challenging to erect cranes on an existing structure, and we had to erect cranes at 250m HUH. 2 internal 1 x Wolff 500B 1 x MR295 20T and 1 x MCR225

PARAGON.jpg

The Paragon By IGO

Perfectly situated next to downtown and Dubai’s prime economic hubs, The Paragon by IGO combines sophisticated city style with all the benefits of trendy community living. An upscale lifestyle with more amenities than you could dream up, these apartments are created for the future-minded buyer who won’t settle for anything but unmatched perfection.

​

  • 1 Nos Potain GTMR 386-B, Max Capacity of 8 Ton External Climbing with 50M Jib

  • Final Height 22.6M

​

Binghatti Creek

BINGHATTI.jpg
BINGHATTI CREEK.jpg

The stream-set technique mimics the beauty of the water gushing through the river. It offers a scintillating illumination to the hyper tower, a design mechanism reflecting a patented architectural prototype driven by the brand’s philosophy. The design strategy lends itself to the sum of parts forming the whole. The exterior lighting scheme follows the contouring of the paint finishes forming accents that highlight the tower’s striking architecture.

​

  • 2 Nos Potain MR 160 10 Ton Max Capacity External Climbing with 50M Jib

  • Final Height 87M

​

Rajiv Karani Villa

Residential projects have the most diverse requirements in our experience. To achieve a certain look and feel, it is necessary you are equipped with the right set of tools and knowledge. This Emirates villa exhibits one such high-end requirement we came across to reflect intricacy in its modern art décor. 

​

  • Potain MCT 78, Jib: 30M

  • Height: 26M

​

Any Upcoming Projects will be updated here.

© 2023 Copyright Omran Group FZCO. All Rights Reserved / Powered by Omran Group Management

  • Instagram
  • Twitter
  • Facebook
  • Linkedin
bottom of page